Since January 2021 high-priority seed has required a phytosanitary certificate, prenotification via PEACH, and import inspections at Place of Destinations (PoDs). The PoD scheme was a temporary measure to ease new requirements following EU Exit, and ends on 31st December 2021. They will be replaced by checks at Border Control Posts (BCPs) and Control Points (CPs).